Close Menu
SagePay - Accepted cards Call us today Visit AGD Systems Insulated Industrial roller shutter door Security Shutters Steel Side Hinged Garage Doors Insulated electric roller garage doors

Sectional Overhead Door Delivery Times

We offer a wide range of insulated sectional doors for both domestic and industrial applications and the delivery dates are very different between the 2 types.

Domestic Sectional Doors.
We offer both standard and purpose made insulated sectional garage doors and most of them can be offloaded by one or 2 people upon delivery with varying size delivery lorries for the task used.

Industrial Sectional Doors
All the industrial sectional doors are made to order and will be delivered on far larger lorries generally with manual handling far more difficult and we advise the use of lifting equipment on site. 


Delivery Times:

Industrial Sectional Doors

Hormann - All SPU F42 and SPU 67 models available on a fast track programme
Up to 6 weeks from point of order

All other sectional doors with full glazing, wicket doors and other non standard features - 10 - 12 weeks from order

 

Samson Sectional Doors - Insulated steel models
Standard colours 2-4 weeks from point of order

Special colours or special tracking arrangements - add approx. 2 weeks

 


Domestic Sectional Garage Doors

Hormann Steel Sectional Garage Doors (Same for Garador)
 2 - 4 weeks for standard UK sizes, standard colours - LPU 42 models
8 - 10 weeks on other sizes and colours but some sizes and colours are ex stock - please check before ordering with us.
+2 weeks for wicket door options included on order
10 - 12 weeks for non standard and European sizes
+2 weeks for LPU 67 super insulated models

 

Carteck Steel Sectional Garage Doors

Standard sizes in Black, White or Anthracite approx. 2-3 weeks

Standard sizes in Trend, Trend Plus colours approx. 5-6 weeks
ANY RAL special colours or Coastal paint upgrades - add extra 2 weeks

XL and Supersize sectional door models approx. 5-6 weeks

 

SWS Seceuroglide Steel Sectional Garage Doors
Standard size doors 4 - 6 weeks from order

Non Standard sizes and colours - 6 - 7 weeks from order

 

 

 

We use cookies to provide you with a better website experience.
Additionally, Google may use data collected through our site for analytics and improving user experiences. You can click here to learn more about how Google uses your data.