How long does it take to manufacture and install an industrial roller shutter door?
The timescale for an industrial roller shutter door will always depend on the size, specification and finish required, but as a general guide most standard made‑to‑measure shutters take a few weeks from order to installation. Powder coated colours, special cladding, higher security ratings or insulated curtains can add to the lead time, as can very large sizes requiring heavier barrels and lifting equipment on site. Once the door is manufactured and delivered, a straightforward replacement or new opening is usually completed in a single visit by an experienced installation team, assuming suitable access and groundwork are already in place. More complex projects with multiple shutters, structural steelwork or integration with access control and safety systems will naturally take longer, and it is always best to discuss your programme dates with us as early as possible so we can plan production and installation around your site requirements.
What power supply do I need for an electric industrial roller shutter door?
What control options are available for roller shutter doors?
How long does it take to manufacture and install an industrial roller shutter door?
Can you replace my existing roller shutter door like‑for‑like?
Can roller shutter doors be used on fire escape routes or as fire shutters?